Past Performance OCONUS- Outside Continental US

Department of the Army- Army Contracting Agency- Pacific Region
Camp Zama, Japan

  • Delivery of materials for holocom SIPRNet installation
  • Design, build and installation of Holocom SIPRNet upgrade- 547 drops which includes:
    • Site survey of existing building and system
    • Creation of Statement of Work
    • Creation of AutoCad drawings for installation
    • Providing security cleared personnel for escorting local subcontractor into secure areas
    • Providing engineers for installation work
    • Site preparation includes- dedicated power, grounding; secure rack installation; termination and testing of all cable installed

Ft Wainwright, AK

  • Delivery of materials for Holocom SIPRNet installation
  • Training personnel on Holocom PDS installation

Department of the Army- 58th Signal Battalion
Okinawa, Japan

  • Procurement of Microwave Antenna Contingency Bill of Materials required for stockage due to projected destructive typhoons during May-Nov each year
  • Provide heavy equipment, fuel and scaffolding rentals for Fort Buckner
  • Upgraded and replaced the existing dehydrators on all critical Microwave Antenna Communications Towers throughout Okinawa
  • Supplied engineering, designing, upgrading, installing, repairing and furnishing of materials, and other related supports required to accomplish, repair, modify and improve, waterproofing and typhoon proofing of the facilities at Ft Buckner and Torii Station
  • De-installed and removed Generator Control Panel, cables and Load at Fort Buckner
  • Provided sealant and sealed and repaired all base foundations of three communications shelters at Torii Station
  • Sealed and repaired all outside electrical and communications conduits, wireways, boxes and conduits to prevent water intrusion from entering the shelters and electrical system at Torii Station
  • Removed and replaced 4 HVAC units and 2 dehumidifiers, including drains to the exterior and minor electrical work at Ft Buckner
  • Painting and corrosion control on 4 Torii Station Teleport antennas

Department of the Navy- Naval Ship Repair Facility
Yokosuka, Japan

  • Delivery of over a thousand Dell computer stations and laptops for replacement and upgrade of existing work stations
  • Delivery of several hundred Dell computer stations to support the USS Kittyhawk overhaul
  • Delivery of Sony Projector for installation in the ERP Training Facility
  • Delivery of Cisco routing system
  • Delivery of large format printers
  • Delivery of Fuji digital cameras
  • Delivery of cabling materials for systems upgrade
  • Delivery of software, patch cables, panels and other materials for network installation at Yokosuka and Sasebo, Japan

Department of the Navy- Commander Fleet Activities
Naval Air Facility- Kadena, Okinawa Japan

  • Installed Protected Distribution System (PDS) upgrades in multiple buildings
  • Installed Outside Plant (OSP) and CCTV equipment
  • Installed conduit and inner duct between two locations
  • Installed government provided fiber optic cable
  • Installed network data cabinet, a patch panel, patch cables, and a Cisco switch
  • Installed new 4t, 14kw, 48,000 btu/h Split Air Conditioning Unit
  • Delivery of Cisco 3550 switch with maintenance
  • Delivery of WebSense software licenses

Department of the Navy- NAVCOMTELSTA FAR EAST
Yokosuka, Japan

  • Delivery of construction materials, such as: conduit, shackle sleeves, cabling

 